Power House

Nenskra HPP is planned on the left bank of the Nenskra river. Power unit will be comprised by HPP powerhouse, tailrace for discharged water, GIS station and pothead yard.

Water will be supplied from the intake of the headrace tunnel to the end of the penstock. Penstock starts from the surge, which then transfers into turbine tunnels. Waste water will be discharged to the Nenskra river by tailrace.

In the operation, 3 units of Pelton turbine type electro-mechanical plant will be installed, with installed capacity of 93.3 MW each.